12.16.19

Compacting the base for a paver walkway

Posted in Masonry, Pavers, Uncategorized at 6:53 AM by Administrator

After you have dug out for your walkway, we recommend making sure that the existing soil that you leave behind is at a constant grade as you do not want this material to be irregular (some small mounds or low points are bad). Start by spreading 3/4″ crushed stone as the base for your paver walkway. You will need to rake the 3/4″ crushed stone so that it is even before compacting. Compacting is done by using a machine that mechanically condenses the crushed stone into a solid foundation for your future walkway. We use a CR-6 compactor that has a computer on it as the computer displays when an area is fully compacted or needs additional compaction. Once we are fully compacted then we re-check our heights. If the crushed stone is at the right height then we set up the screed bars before spreading 3/8″ crushed stone. We will screed the 3/8″ crushed stone and then we lay the pavers.

Compacted 3/4″ crushed stone base for paver walkway

The most important part of building a walkway is making sure that you have the right base material and that it is fully compacted. For information about how Artistic Landscapes can help you with your walkway or patio, please call us at 978.948.2900 to setup an appointment or stop by our Office on Route One, 111 Newburyport Turnpike, in Rowley.

Comments are closed.